[Nspcsg] NSP1_Flimsy_16_CSG_report - 150411.docx

barbara.clark at faa.gov barbara.clark at faa.gov
Sun Apr 12 08:21:32 MDT 2015


Tim -

Action List

This is still an old version. It looks to me like an old version was used to add some new material. Actions 76, 137, 173, 176, and 180 were all closed prior to this meeting.  Suggest drawing from list below to update the log.

76 -  Resurrected and discussed at the end of the October 2014 meeting in Montreal. (Discussion not reflected in the report.  Likely wasn't considered important.  I presented the old documentation on the original action item and got feedback from the group on how to pursue it in light of the matured GAST D concept.)  Closed in Ishigaki. Action was made obsolete by the WLSQ weighting matrix assessment and the dual solution comparison requirement. (I can't find the Ishigaki CSG report or revised action log at the output of that meeting.)
137 - Flimsy 8 Feb 2015 Ishigaki
173 -  Flimsy 3 Feb 2015 Ishigaki
176 - Flimsy 4 Feb 2015 Ishigaki
180 - WP-4 Feb 2015 Ishigaki + I thought maybe there was something after this.  Someone with validation matrix access should check.  It would likely be noted for Appendix B Section 3.6.8.3.3.2 and 3.6.8.3.3.3.1.

Editorials.....


Section 1.0 - Update meeting reference

The CSG held several teleconferences since the joint CSG/VSG meeting in Ishigaki (February 2015) to advance the work of the group and prepare for this meeting.

Attachment with Working Papers - Update meeting reference

LIST OF WORKING PAPERS for CSG Meeting - April 7-10 , 2015 -Montreal, Canada

- Barbara

From: Nspcsg [mailto:nspcsg-bounces at aeronav.net] On Behalf Of Naerlich, Stefan
Sent: Sunday, April 12, 2015 1:15 AM
To: Murphy, Tim
Cc: nspcsg at aeronav.net
Subject: Re: [Nspcsg] NSP1_Flimsy_16_CSG_report - 150411.docx

Tim -

This is fine by me with only a few additions
- Text in the title on the first page overlaps
- The following text needs correction:

"....In addition a new area of work has been accepted:  Extended Service Volume for GBAS.  States and other interested stake holders have...." (Propose to delete final half-sentence)
- Pls add my name to the last action #185

Thanks for your intensive work.
- Stefan


Am 11.04.2015 um 17:28 schrieb Murphy, Tim <tim.murphy at boeing.com<mailto:tim.murphy at boeing.com>>:
CSG Members,

Attached is a draft of the CSG meeting report.  Please provide any comments/repairs by 4/12 5 PM Montreal time so I can include them in the next version that will be released as a flimsy.   If you can't make that deadline, I will be asking for any final changes by 4/21 COB before the report is finalized.

Thanks

Tim Murphy
Senior Technical Fellow
Communications, Navigation and Surveillance - BCA - Airplane Systems
Office (425) 965-6744 - Cell (425) 280-6844 - Fax (425) 342-5812


<NSP1_Flimsy_16_CSG_report - 150411.docx>
_______________________________________________
Nspcsg mailing list
Nspcsg at host412.hostmonster.com<mailto:Nspcsg at host412.hostmonster.com>
http://host412.hostmonster.com/mailman/listinfo/nspcsg_aeronav.net
________________________________
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://host412.hostmonster.com/pipermail/nspcsg_aeronav.net/attachments/20150412/40553eec/attachment.html>


More information about the Nspcsg mailing list