From tim.murphy at boeing.com Thu Oct 1 17:29:03 2020 From: tim.murphy at boeing.com (Murphy (US), Tim) Date: Thu, 1 Oct 2020 23:29:03 +0000 Subject: [NSP-GWG] Draft of WP 8 for GWG review Message-ID: <9116c13ce2274a3da74c043fa89341eb@boeing.com> GWG Members, Attached is a draft of WP 8 for NSP/6. The paper includes a change proposal for the SARPs to allow for Eig to be > 2.75 in some cases where operational requirements permit. Please review the WP before our meeting on Wednesday 10/7. Comments can be provided in advance to myself, Matt Harris and/or Linda Lavik. There is a companion paper (WP 9) that will contain much of the validation information for the proposed change. We will circulate that paper soon, also for review prior to the meeting. Thanks Tim Murphy Senior Technical Fellow Communications, Navigation and Surveillance - BCA - Airplane Systems Office (425) 965-6744 - Cell (425) 280-6844 - Fax (425) 342-5812 [http://brandcenter-dev.web.boeing.com/common/images/boeing_logo_email.gif] -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.gif Type: image/gif Size: 3116 bytes Desc: image001.gif URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: NSP6_wp08_GASTDEig.docx Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document Size: 86323 bytes Desc: NSP6_wp08_GASTDEig.docx URL: From matt.harris at boeing.com Wed Oct 7 01:59:55 2020 From: matt.harris at boeing.com (Harris (US), Matt) Date: Wed, 7 Oct 2020 07:59:55 +0000 Subject: [NSP-GWG] Draft of WP 8 for GWG review In-Reply-To: <9116c13ce2274a3da74c043fa89341eb@boeing.com> References: <9116c13ce2274a3da74c043fa89341eb@boeing.com> Message-ID: <1306f6b4883a4d92af0271bea827ea22@boeing.com> GWG Members, Attached is a draft of WP 9 for NSP/6. This paper mentioned by Tim below includes validation material supporting the WP 8, including sensitivity of EIG to GBAS - LTP distance and iono threat space, as well as sensitivity of availability vs. EIG and airborne geometry screening. Two presentations are proposed as attachements to the WP 9. Talk to you in a while. Matt Harris Associate Technical Fellow Electronics Systems Integration / Navigation Boeing Commercial Airplanes From: Nspcsg [mailto:nspcsg-bounces at aeronav.net] On Behalf Of Murphy (US), Tim Sent: Thursday, October 01, 2020 4:29 PM To: nspcsg at aeronav.net Subject: [NSP-GWG] Draft of WP 8 for GWG review GWG Members, Attached is a draft of WP 8 for NSP/6. The paper includes a change proposal for the SARPs to allow for Eig to be > 2.75 in some cases where operational requirements permit. Please review the WP before our meeting on Wednesday 10/7. Comments can be provided in advance to myself, Matt Harris and/or Linda Lavik. There is a companion paper (WP 9) that will contain much of the validation information for the proposed change. We will circulate that paper soon, also for review prior to the meeting. Thanks Tim Murphy Senior Technical Fellow Communications, Navigation and Surveillance - BCA - Airplane Systems Office (425) 965-6744 - Cell (425) 280-6844 - Fax (425) 342-5812 [http://brandcenter-dev.web.boeing.com/common/images/boeing_logo_email.gif] -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.gif Type: image/gif Size: 3116 bytes Desc: image001.gif URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: NSP6_wp09_GASTDEig_Validation.docx Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document Size: 527960 bytes Desc: NSP6_wp09_GASTDEig_Validation.docx URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: Availability of GAST D versus EV and EIG 20201007.pptx Type: application/vnd.openxmlformats-officedocument.presentationml.presentation Size: 2000407 bytes Desc: Availability of GAST D versus EV and EIG 20201007.pptx URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: LowLatIonoAndGASTDValidation_20200129.pdf Type: application/pdf Size: 606190 bytes Desc: LowLatIonoAndGASTDValidation_20200129.pdf URL: From Natalia.CASTRILLOMERLAN at gsa.europa.eu Tue Oct 13 01:39:33 2020 From: Natalia.CASTRILLOMERLAN at gsa.europa.eu (CASTRILLO MERLAN Natalia EXT) Date: Tue, 13 Oct 2020 07:39:33 +0000 Subject: [NSP-GWG] Draft of WP 8 for GWG review In-Reply-To: <9116c13ce2274a3da74c043fa89341eb@boeing.com> References: <9116c13ce2274a3da74c043fa89341eb@boeing.com> Message-ID: <3217531e0f864f1a91e887951a37b405@gsa.europa.eu> Dear Tim and all, Please find attached a WP which proposes a GAST-F standardization workplan for ICAO. We would like to discuss it tomorrow at GWG. Thank you and best regards, Natalia From: Nspcsg On Behalf Of Murphy (US), Tim Sent: Friday, 2 October 2020 01:29 To: nspcsg at aeronav.net Subject: [NSP-GWG] Draft of WP 8 for GWG review GWG Members, Attached is a draft of WP 8 for NSP/6. The paper includes a change proposal for the SARPs to allow for Eig to be > 2.75 in some cases where operational requirements permit. Please review the WP before our meeting on Wednesday 10/7. Comments can be provided in advance to myself, Matt Harris and/or Linda Lavik. There is a companion paper (WP 9) that will contain much of the validation information for the proposed change. We will circulate that paper soon, also for review prior to the meeting. Thanks Tim Murphy Senior Technical Fellow Communications, Navigation and Surveillance - BCA - Airplane Systems Office (425) 965-6744 - Cell (425) 280-6844 - Fax (425) 342-5812 [http://brandcenter-dev.web.boeing.com/common/images/boeing_logo_email.gif] ______________________________________________________________________ This email has been scanned by the Destiny Email Security System. For more information please visit http://www.destiny.be ______________________________________________________________________ ______________________________________________________________________ This email has been scanned by the Destiny Email Security System. For more information please visit http://www.destiny.be ______________________________________________________________________ -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.gif Type: image/gif Size: 3116 bytes Desc: image001.gif URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: NSP6_wpxx_DFMC GBAS proposed workplan for ICAO GWG.docx Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document Size: 76646 bytes Desc: NSP6_wpxx_DFMC GBAS proposed workplan for ICAO GWG.docx URL: From tim.murphy at boeing.com Tue Oct 13 15:20:09 2020 From: tim.murphy at boeing.com (Murphy (US), Tim) Date: Tue, 13 Oct 2020 21:20:09 +0000 Subject: [NSP-GWG] Information Paper Message-ID: <84136b185dad4ad78229563a48db4368@boeing.com> GWG Members Attached is an information paper to support tomorrow's discussion (GWG teleconference 10/13/2020). Thanks Tim Murphy Senior Technical Fellow Communications, Navigation and Surveillance - BCA - Airplane Systems Office (425) 965-6744 - Cell (425) 280-6844 - Fax (425) 342-5812 [http://brandcenter-dev.web.boeing.com/common/images/boeing_logo_email.gif] -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.gif Type: image/gif Size: 3116 bytes Desc: image001.gif URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: NSP6_ipxx_DFMC_GBAS_Timeline.docx Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document Size: 71931 bytes Desc: NSP6_ipxx_DFMC_GBAS_Timeline.docx URL: From tim.murphy at boeing.com Thu Oct 15 14:23:24 2020 From: tim.murphy at boeing.com (Murphy (US), Tim) Date: Thu, 15 Oct 2020 20:23:24 +0000 Subject: [NSP-GWG] Joint GWG - RTCA SC-159 WG 4 Meeting Message-ID: <288b878bff774fa7b64d953d544ceb52@boeing.com> NSP GWG Members, As discussed on the last teleconference, the SC-159 WG 4 meeting will be a joint meeting with GWG. The intent is to continue progressing the work on DFMC GBAS with an emphasis on coordination between GWG and WG4. An agenda will be circulated before the meeting. Please use the following WebEx information to join the meeting. WG-4 (9:00 AM - 3:00 PM ET): https://rtca.webex.com/rtca/j.php?MTID=m0dbab41fa38b06b47e1dc83762a5ca91 Meeting number: 132 003 1873 Password: 3Jdb2qCDAZ6 Thanks Tim Murphy NSP Member nominated by ICCAIA and GWG Rapporteur Senior Technical Fellow - Boeing Communications, Navigation and Surveillance - BCA - Airplane Systems Office (425) 965-6744 - Cell (425) 280-6844 - Fax (425) 342-5812 -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: text/calendar Size: 2296 bytes Desc: not available URL: From tim.murphy at boeing.com Tue Oct 20 06:46:20 2020 From: tim.murphy at boeing.com (Murphy (US), Tim) Date: Tue, 20 Oct 2020 12:46:20 +0000 Subject: [NSP-GWG] FW: [EXTERNAL] Re: RTCA SC-159 WG-4 Meeting Plan -- October 19 - 22 In-Reply-To: References: Message-ID: NSP GWG members, Please note the attached agenda for the joint meeting with RTCA SC-159 WG 4 on Thursday. Thanks Tim Murphy Senior Technical Fellow Communications, Navigation and Surveillance - BCA - Airplane Systems Office (425) 965-6744 - Cell (425) 280-6844 - Fax (425) 342-5812 [http://brandcenter-dev.web.boeing.com/common/images/boeing_logo_email.gif] From: Joel Wichgers [mailto:joel.wichgers at collins.com] Sent: Monday, October 19, 2020 4:13 PM To: sc-159_wg-4 at workspace.rtca.org Cc: Murphy (US), Tim Subject: [EXTERNAL] Re: RTCA SC-159 WG-4 Meeting Plan -- October 19 - 22 This message was sent from outside of Boeing. Please do not click links or open attachments unless you recognize the sender and know that the content is safe. Fellow RTCA SC-159 WG-4 members, The attached documents contain additional information regarding our meeting plan. Best regards, Joel Wichgers in coordination with co-chairman Matt Harris of RTCA SC-159 WG-4 On Thu, Oct 15, 2020 at 4:39 PM Joel Wichgers > wrote: Fellow RTCA SC-159 WG-4 members, We will be meeting virtually (using WebEx) next week, October 19-22 (Monday - Thursday). Monday - Wednesday: WG-4 will be meeting jointly with RTCA SC-159 WG-2 and with EUROCAE WG-62 (from 7:00 am to 12 noon Eastern time). Stay tuned for the more detailed agenda for this joint meeting. The focus of this portion of the meeting is to discuss DFMC GNSS items relevant for the baseline DFMC MOPS. Thursday On Thursday, October 22, we have scheduled a WG-4 meeting from 9:00 am - 3:00 PM Eastern Time. We are still working on the final agenda for this meeting, but a large portion of the meeting will be joint with the ICAO Navigation System Panel (NSP) GBAS Working Group (GWG). The intent of this part of our meeting is to progress work on DFMC GBAS with emphasis to coordinate and align the proposed standards development plans among the RTCA SC-159 and ICAO NSP GBAS working groups. Best regards, Joel Wichgers co-chairman with Matt Harris of RTCA SC-159 WG-4 P.S. Note that Karan Hofmann has distributed the WebEx information for our meetings. -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.gif Type: image/gif Size: 3116 bytes Desc: image001.gif URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: RTCA-SC159_WG4_Agenda_2020-10.doc Type: application/msword Size: 48128 bytes Desc: RTCA-SC159_WG4_Agenda_2020-10.doc URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: Proposed_Agenda_for-Joint-RTCA-WG2-WG4-and-Eurocae-WG-62-portion-of-Meeting.doc Type: application/msword Size: 60928 bytes Desc: Proposed_Agenda_for-Joint-RTCA-WG2-WG4-and-Eurocae-WG-62-portion-of-Meeting.doc URL: From tim.murphy at boeing.com Fri Oct 23 13:22:44 2020 From: tim.murphy at boeing.com (Murphy (US), Tim) Date: Fri, 23 Oct 2020 19:22:44 +0000 Subject: [NSP-GWG] FW: EUROCONTROL presentation at RTCA/NSP joint GBAS meeting In-Reply-To: References: Message-ID: <79fc95a92d2b44cbb56f9333c5d7f009@boeing.com> NSP GWG members, Attached is the briefing that Andreas Lipp gave to our joint session with SC-159 WG 4. Thanks Tim Murphy Senior Technical Fellow Communications, Navigation and Surveillance - BCA - Airplane Systems Office (425) 965-6744 - Cell (425) 280-6844 - Fax (425) 342-5812 [http://brandcenter-dev.web.boeing.com/common/images/boeing_logo_email.gif] -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.gif Type: image/gif Size: 3116 bytes Desc: image001.gif URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: RTCA 10-2020 presentation proposal.pdf Type: application/pdf Size: 340480 bytes Desc: RTCA 10-2020 presentation proposal.pdf URL: From tim.murphy at boeing.com Fri Oct 23 16:02:10 2020 From: tim.murphy at boeing.com (Murphy (US), Tim) Date: Fri, 23 Oct 2020 22:02:10 +0000 Subject: [NSP-GWG] FW: Webex invitations for NSP/6 - Part 2 - Outlook format In-Reply-To: <4e02db4371a1466b8d4d095b1b27a4c3@icao.int> References: <4e02db4371a1466b8d4d095b1b27a4c3@icao.int> Message-ID: <2e1358f8ee734fb1929bf8e0022ec4ac@boeing.com> GWG members, Please see the attached. Thanks Tim Murphy Senior Technical Fellow Communications, Navigation and Surveillance - BCA - Airplane Systems Office (425) 965-6744 - Cell (425) 280-6844 - Fax (425) 342-5812 [http://brandcenter-dev.web.boeing.com/common/images/boeing_logo_email.gif] From: Capretti, Alessandro [mailto:ACapretti at icao.int] Sent: Friday, October 23, 2020 7:26 AM To: Capretti, Alessandro ; Adrio Taucer (adrio.taucer at tc.gc.ca) ; benoit.roturier at aviation-civile.gouv.fr; Bodero Alonso, Ana (abodero at enaire.es) ; DiBenedetto, Mike (dibenede at ohio.edu) ; E. Chatre ; I.Banyasz ; J. Bollard ; J. Hermens (jules.hermens at ilent.nl) ; Julien Lapie ; Johan van Schalkwyk ; K. Alexander ; K. Matsuda ; korchagin_va at comtv.ru; M. Grandt ; M. Scaramuzza ; Nick Hall ; Noppadol Pringvanich ; P. Singh ; QinZhi ; R. Abregu ; S. Naerlich ; Murphy (US), Tim ; V. Santos da Silva ; Vasco Locci ; W. Lim ; W.K. Lo Cc: Barbara Clark ; Felix.Butsch at dfs.de; Gary Berz ; Mikael Mabilleau Subject: [EXTERNAL] Webex invitations for NSP/6 - Part 2 - Outlook format This message was sent from outside of Boeing. Please do not click links or open attachments unless you recognize the sender and know that the content is safe. Dear colleagues As mentioned in ?Part 1?, the Webex meeting details are attached here in Outlook format. Note that there are 14 attachments instead of 17 (total number of Webex sessions), because one of the attachments contains details for four sessions. Please make available to your advisors as required (I am only sending this message to panel members). Best regards Alessandro -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: image001.gif Type: image/gif Size: 3116 bytes Desc: image001.gif URL: -------------- next part -------------- An embedded message was scrubbed... From: "Butsch, Felix" Subject: updated invitation for the November-meeting of the ICAO NSP Spectrum Working Group (SWG) with Webex access information Date: Tue, 20 Oct 2020 07:48:16 +0000 Size: 61771 URL: -------------- next part -------------- An embedded message was scrubbed... From: CASTRILLO MERLAN Natalia EXT Subject: ICAO NSP6 VWG WebEx - 5th Nov Date: Wed, 14 Oct 2020 06:42:33 +0000 Size: 35917 URL: -------------- next part -------------- An embedded message was scrubbed... From: CASTRILLO MERLAN Natalia EXT Subject: ICAO NSP6 VWG WebEx - 3rd Nov Date: Wed, 14 Oct 2020 06:41:08 +0000 Size: 35898 URL: -------------- next part -------------- An embedded message was scrubbed... From: CASTRILLO MERLAN Natalia EXT Subject: ICAO NSP6 VWG WebEx - 2nd Nov Date: Wed, 14 Oct 2020 06:39:12 +0000 Size: 35904 URL: -------------- next part -------------- An embedded message was scrubbed... From: MABILLEAU Mikael EXT Subject: NSP/6 Plenary Day3/3 Date: Fri, 25 Sep 2020 12:52:31 +0000 Size: 45478 URL: -------------- next part -------------- An embedded message was scrubbed... From: MABILLEAU Mikael EXT Subject: NSP/6 Plenary Day2/3 Date: Fri, 25 Sep 2020 12:52:15 +0000 Size: 45486 URL: -------------- next part -------------- An embedded message was scrubbed... From: MABILLEAU Mikael EXT Subject: NSP/6 Plenary Day1/3 Date: Fri, 25 Sep 2020 12:51:56 +0000 Size: 45474 URL: -------------- next part -------------- An embedded message was scrubbed... From: MABILLEAU Mikael EXT Subject: NSP/6 GSWG Date: Fri, 25 Sep 2020 12:51:41 +0000 Size: 45437 URL: -------------- next part -------------- An embedded message was scrubbed... From: MABILLEAU Mikael EXT Subject: NSP/6 GSWG/VWG joint session Date: Fri, 25 Sep 2020 12:51:25 +0000 Size: 45509 URL: -------------- next part -------------- An embedded message was scrubbed... From: MABILLEAU Mikael EXT Subject: NSP/6 DS2 Day 4/4 Date: Fri, 25 Sep 2020 12:51:03 +0000 Size: 45472 URL: -------------- next part -------------- An embedded message was scrubbed... From: MABILLEAU Mikael EXT Subject: NSP/6 DS2 Day3/4 Date: Fri, 25 Sep 2020 12:50:44 +0000 Size: 45460 URL: -------------- next part -------------- An embedded message was scrubbed... From: MABILLEAU Mikael EXT Subject: NSP/6 DS2 Day 2/4 Date: Fri, 25 Sep 2020 12:50:09 +0000 Size: 45466 URL: -------------- next part -------------- An embedded message was scrubbed... From: MABILLEAU Mikael EXT Subject: NSP/6 VWG/SWG/GSWG/DS2 joint session Date: Fri, 25 Sep 2020 12:50:26 +0000 Size: 45525 URL: -------------- next part -------------- An embedded message was scrubbed... From: MABILLEAU Mikael EXT Subject: NSP/6 DS2 Day 1/4 Date: Fri, 25 Sep 2020 12:49:54 +0000 Size: 45463 URL: From tim.murphy at boeing.com Wed Oct 28 18:34:42 2020 From: tim.murphy at boeing.com (Murphy (US), Tim) Date: Thu, 29 Oct 2020 00:34:42 +0000 Subject: [NSP-GWG] NSP GWG - Final NSP/6 preparation. Message-ID: <01a13c5180b74d319aaa888a8b0af96a@boeing.com> /R1 - Added Agenda slide and 2 papers to be discussed during the meeting. NSP GWG Members, Please save this time and date for a final meeting to prepare for NSP/6. Preliminary agenda. 1: Discuss status of maintenance proposal WP and supporting IPs. 2: DFMC - Discuss outcomes of previous teleconference and joint discussions or GWG and SC-159 WG 4 - Reach consensus on any proposal to change the job card (or not) - Review GWG status report material to be presented on NSP/6 Please provide any feedback you may have on this agenda, e.g. additional items to be discussed etc. Thanks Tim Murphy Senior Technical Fellow Communications, Navigation and Surveillance - BCA - Airplane Systems Office (425) 965-6744 - Cell (425) 280-6844 - Fax (425) 342-5812 -- Do not delete or change any of the following text. -- Join Webex meeting Meeting number: 144 395 8498 Meeting password: JdzBQFfT834 For a Non-Boeing Videoconferencing system: Dial: WebexMeetingNumber at boeing.webex.com Or Dial 173.243.2.68 and enter the Webex Meeting number Boeing Video Dialing Instructions Join by phone +1-425-943-7320 U.S. NW 1-888-787-5387 U.S Toll Free-high cost Access code: 144 395 8498 Global call-in numbers | Toll-free calling restrictions Join by mobile CCM:+14259437320x1443958498# Can't join the meeting? Contact support. -------------- next part -------------- An HTML attachment was scrubbed... URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: not available Type: text/calendar Size: 5293 bytes Desc: not available URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: ATT42443 1.jpg Type: image/jpeg Size: 2283 bytes Desc: ATT42443 1.jpg URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: NSP GWG Meeting 20201029.pptx Type: application/vnd.openxmlformats-officedocument.presentationml.presentation Size: 33072 bytes Desc: NSP GWG Meeting 20201029.pptx URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: NSP6_ip17_Alternative_Architecture_for_DFMC_GBAS - v0.pdf Type: application/pdf Size: 755738 bytes Desc: NSP6_ip17_Alternative_Architecture_for_DFMC_GBAS - v0.pdf URL: -------------- next part -------------- A non-text attachment was scrubbed... Name: NSP6_ip16_DFMC_GBAS_Timeline-post meeting20201028_revised.pdf Type: application/pdf Size: 258372 bytes Desc: NSP6_ip16_DFMC_GBAS_Timeline-post meeting20201028_revised.pdf URL: